References asbestos removal

Demontage der Wellasbestbekleidung zum großen Teil erfolgt Approx. 3,000 m² asbestos sheets of an airplane hangar in Nuremberg were dismantled.

Since very high standards prevail at the airport, only qualified and safety examined mechanics are allowed to work there. As Senft GmbH disposes of all the necessary admissions and safety test certificates, we were chosen to carry out this building project.


Photo gallery and information
Verpacken und Sichern der Wellasbestplatten auf der Ladergabel Koblenz - asbestos removal - 5,000 m² roof surface

We received an order from the DEG company in Koblenz to remove 5,000 m² roof surface from their site. We dismantled and disposed of asbestos cement slabs with a total weight of approx. 110 t.


Photo gallery and information
Asbestos abatement, asbestos disposal over sales areas in Dortmund

In Dortmund we dismantled and disposed of 8,000 m² roof covering composed of asbestos cement slabs in cooperation with a roofing company. Approx. 500 m² were cleared up per day and covered with new material. The discounters located underneath the roof remained open for the customers without restriction.


Photo gallery and information
Duisburg 3,800 m² asbestos removal - sawing off 24 balconies built of reinforced concrete

BWE Duisburg - 2,800 m² asbestos slabs including the substructure and mineral wool insulation were removed and disposed of in a residential building in compliance with all corresponding regulations. Furthermore sawing off, demolition and disposal of 24 balconies built of reinforced concrete.


Photo gallery and information
Demontage der Asbeststreifen Harzheim asbestos removal from cooling tower

Dismantling and disposal of strips of segmental panels containing asbestos from the interior of a cooling tower at Harzheim.


Photo gallery and information
Demontage und trennen der Rohre Removal of asbestos pipes

At Brücke near Königswinter asbestos pipes had to be dismantled and professionally disposed of.


Photo gallery and information
Eingerüstetes Gebäude Asbestos removal

Herten, Pankower Straße
Dismantling of 1,500 m² asbestos cement slabs and mineral fibre insulating panels including the substructure and the provision of 850 m² scaffolding and all the disposal work.
Dismantling time: 8 working days


Photo gallery and information
Verpacken der Materialien Asbestos removal in Dortmund

In Dortmund at Stockumer Straße asbestos removal works were executed on top of a club house, approx. 280 m² asbestos panels were removed in cooperation with our roofer. Due to the weather conditions approx. 150 m² were cleared up and newly covered straight away. Also here again the wrapping of the contaminated material was disposed of in the standardized way.


Photo gallery and information
Disposal of 2,800 - 3,000 m² asbestos slabs incl. artificial mineral fibre and the substructure

Kamen, Weimarerstraße 14
Here 2,800 - 3,000 m² asbestos slabs incl. the substructure and the artificial mineral fibre materials were dismantled and disposed of. The customer received all services from a single source, e. g. the erection of scaffolds over 3,500 m², the dismantling and disposal etc. The building project was subdivided into 3 construction stages to the effect that the new thermal insulated facade could be mounted again rapidly.


Photo gallery and information
Osnabrück residential complex

Residential complex in Osnabrück
120 balconies with a weight of 5.40 t each were professionally dismantled and disposed of using a merlo resp. a 100-tonne truck crane.
Furthermore 18 reinforced concrete canopies were dismantled, 1,000 linear metres fascia built of precast reinforced concrete units as well as 800 m² asbestos cement slabs were dismantled and also professionally disposed of.


Photo gallery and information
1200 qm Wellasbestplatten in 2 Tagen entsorgen Hattingen

1,200 m² Eternit corrugated sheets containing asbestos had to be removed within 2 days. Duration of the works: 2 days, 3 skilled workers on site at Hattingen.


Photo gallery and information
Entfernen der Asbestplatten Theodor-Fliedner-Gymnasium in Düsseldorf

Here the whole ventilation system cladded with asbestos was restructured in a height of up to 10 m acc. to TRGS 519. The remaining dust had to be moisturized and removed using residual fibre bonding agents.


Photo gallery and information
Maschineneinsatz, dort wo es geht Willi Daume premises in Dortmund

Removal and disposal of 25,000 m² hard asbestos during demolition works.


Photo gallery and information

For getting in touch with us, you can also use our contact form. We will immediately reply to you.

Contact form

* Mandatory