Private customer: 2.5 m² large opening in a 20 cm thick reinforced concrete ceiling
At the family Belinski in Gladbeck a 2.5 m²
large opening was formed in a 20 cm thick reinforced concrete ceiling. In order to prevent the formation of dust in an inhabited house as far as possible, the preparation ot the building site was particularly intensive. At the bottom of the concrete ceiling plastic sheets were applied (all around the area to be sawed out). Formed as a funnel the sheet was guided downward into a cask placed on the floor below. Thus the full amount of dust could be bound by the cooling water of the concrete saw and gathered in that cask. Later on the dust-water mixture was removed from the building by means of a pump.
Special characteristics in the use of the concrete sawing method applied: The sawing was carried out flush to the building wall. By using this technique the formation of a disruptive edge in the transition area between the upper and the lower floor that might have disturbed the later installation of stringer stairs could be avoided.
E-Mail: Lieber Herr Senft,
"nach Abschluss der Arbeiten möchten wir uns bei Ihnen und Ihren Mitarbeitern rechtherzlich bedanken. Mit der gesamten Durchführung sind wir sehr zufrieden ! Wirklich überrascht sind wir darüber, dass fast gar kein Schmutz angefallen ist. Unglaublich bei so einem "massiven Eingriff"! Unterhalb des Deckenausschnittes, also in der 1. Etage und im Erdgeschoss, war alles praktisch staubfrei! Im Dachgeschoß, dort wo die Betonsäge aktiv war, ließ sich der Schmutz natürlich kaum vermeiden.
Da dieser Bereich nicht ausgebaut und bewohnt war störte uns das nicht wirklich. Aber auch hier ließen es sich Ihre Mitarbeiter sich nicht nehmen, die Baustelle absolut besenrein zu verlassen. Danke für die präzise und sprichwörtlich "saubere" Arbeit! Kompliment auch an Ihre Mitarbeiter! Es grüßt Familie Belinski."
Familie Belinski
Photo gallery related to the project